Friday, we got a “Standrohr”, last Monday, Steph&me bought some PE-pipe and stuff to connect these.
After drilling a lot of holes, we pulled about 60-70m 32mm pipe through half of the house where it ends in a small shower and toilet room.
Finally water!
2 nodes, at the moment with the berlin freifunk firmware, each one on a balcony at the 1st floor, are spreading a small meshnetwork around the house. One is fed with uplink by stephs UMTS box.
Carsten put a node in the 2nd floor in the window, people are starting to connect their computer with long ethernet wires to the nearest node.
As the VJs also are pulling wires around the k:ita, it starts getting wrapped up wire wires.
Today, there will be a party with “noise”. Whatever this is, i will find it out tonight.

Tuesday last week, we built power distribution for the west wing, about 18-20 Kw on 6 powerlines.
We are planning to do the same at least for the east wing too, and some smaller distributionpoints for the other parts of the house.
Had a meeting tonight, over 3 hours with more then 20 people. Got a lot of things organized. Now, most will happen in small workgroups, so this kind of exhaustive Meeting will happen less often.
Today, i slept in my room the first time. I also got time for painting it, it’s getting a nice place slowly.
We had a great party and luck with the wether, it kept nice until 1 ‘o clock. After the rain started, we moved into the house, which luckily had enough space.
There were 5 Bands and many DJs playing, a lot visuals and many art items spreaded over the Garden.
Pictures later.
Friday is our opening party: http://k-ita.de
Today, we got powersupply, called “Baustrom”. The next step will be setting up the UMTS-link and the UltraSPARC as a Proxyserver.
And i have finally light for painting my room.